Construction Progress — August 2026
Updated monthly from the field · Phase 1 target: CO 2026-08-31 to Q4 2026
Status this month
- Building A (right): exterior walls and roof fully clad — weather-tight
- Building B (left): steel frame complete, wall and roof panels actively being installed
- 10 demisable suites forming across both buildings — each with drive-in door and storefront office
- Site work continuing between buildings; utilities and paving to follow
- Pre-leasing open for all Phase 1 suites